Easi-Span Industrial Buildings: Testimonials
Utilities Equipment Shelters View Actual Letter
"When these 30’ wide buildings arrived on site it took less than one-week for each to be erected. These building ranged from 60’ to 100’ in length. The cost and time advantage over conventional masonry was exceptional. The Turnkey method provided the Project with a timely and cost effective solution to our Electrical Room building construction.
The fast track design/build solution place the first Electrical Room erected on site within twelve weeks after placement of order."
~ Randy Newton, Manager of Construction Engineering, Kvaerner Process
Wastewater Treatment Facilities View Press Release
"We were attracted to the fact that the buildings are maintenance free, provide a fortified setting for our vital infrastructure and are affordable."
~ Jim Williams, Substation Supervisor, New Braunfel Utility
Electrical Equipment Shetlers
"The Easi-Span buildings are an excellent system and have all the features needed to protect our equipment while offering the owners incredible value … The quick delivery and installation times help keep our projects on time which is critical in our line of work."
~ Avid Podsim, Project Manager, Schneider Electric USA
Large Substation Buildings
"The durability and security of the Easi-Span buildings were important factors in our choice to purchase this building for our new electrical substation."
~ Chris Gerety, Engineer, Texas New Mexico Power Co.